Solar Battery Grants
Business and developers

Commercial battery storage in the UK: independent guides

Use cases, grid and planning rules, and funding reality for businesses and developers.

  • Independent: not a government site, not an installer
  • Every rule checked against official sources
  • Free, no obligation, details shared only with your consent

Planning commercial battery storage?

Tell us about the site. If you consent, an MCS-certified installer or commercial energy adviser covering your area may contact you.

Free to useNot an installerDetails shared only with your consent

Updated 8 October 2026. Independent guide; not a government website and not an installer.

This section is for businesses, landowners and developers looking at battery energy storage systems (BESS). It is educational: we are not an installer and cannot design or quote a system. Funding for businesses is mostly through tax treatment and bill savings rather than grants. Homeowners should start with the home battery grants guide.

Pick the use case

Solar-plus-storage

Add storage to on-site solar so more of the generation is used on site.

Read the guide →

Peak shaving and load shifting

Use a battery to cut demand at the most expensive half-hours.

Read the guide →

Grid connection enabler

Use storage and export or import limits to fit a constrained connection.

Read the guide →

Backup power and resilience

Keep critical loads running through an outage.

Read the guide →

Grid-scale battery storage

Front-of-meter projects for developers and landowners.

Read the guide →

EV charging hub storage

Use batteries where grid capacity limits chargers.

Read the guide →

Funding and tax

Read commercial battery funding for what exists, what is closed, and the questions to put to your accountant.

Planning a commercial battery project? Tell us about the site and get matched with a specialist.Send an enquiry

Things every commercial project needs to settle

  • Grid connection. Above 16 A (3.68 kW) per phase you need a G99 application to the distribution network operator, which is often the longest item.
  • Planning and fire safety. There is no dedicated permitted-development class for batteries, and larger sites can need planning permission and fire-service consultation.
  • Insurance and warranty. Ask your insurer early about battery chemistry and spacing.
  • Data. Sizing starts from half-hourly meter data, not a rule of thumb.

Frequently asked questions

Is commercial battery storage eligible for the 0% VAT rate?

Generally no. The zero rate covers residential accommodation and buildings used solely for a relevant charitable purpose, not general commercial premises.

Is there a grant for commercial battery storage?

We are not aware of an open national grant that pays for behind-the-meter commercial batteries. The Industrial Energy Transformation Fund closed in July 2025 with no successor fund planned. Check your devolved government, combined authority and local enterprise partnership for current programmes.

Where is the homeowner guidance?

Home batteries have their own funding routes. See the home battery grants guide.

Check your eligibility
Check eligibility